Sunset Course improvements at The Country Club at Mirasol are best read as a design-and-infrastructure reset rather than a single-hole cosmetic project. Work on the Sunset Course ran from June 2026 through early September 2026 under Joel Hornickel, ASGCA, in collaboration with JDR Golf Design, with stated goals tied to playability and maintainability for the next 25 years, according to the ASGCA project report.
That framing matters. In golf course design, a bunker rebuild or green shift can look minor from a scorecard view, but it may change sightlines, practice access, pin placement variety, and the way a finishing hole relates to adjacent club facilities. The available evidence does not include scoring averages, green speeds, maintenance costs, or member survey data, so any benchmark has to stay close to documented design changes.
Benchmarking Sunset Course improvements By Design Category
The most useful benchmark for this phase is not whether the course became harder or easier in absolute terms. The better question is whether the changes address identifiable design functions: circulation, short-game preparation, green flexibility, bunker presentation, turf quality, and irrigation control. On that basis, the 2026 Sunset work appears aimed at practical performance as much as visual refresh.
What Sunset Course improvements Changed First
The project’s clearest spatial move came around the practice zone. A planned 41,000-square-foot multipurpose golf facility is set on the site of the former practice putting green, which required the putting green and short-game area to be repositioned. The putting green moved approximately 35 yards closer to the first tee boxes of both the Sunset and Sunrise courses. That is a circulation decision as well as a construction necessity.
From a player-experience standpoint, shifting the practice green closer to two first-tee areas can reduce separation between warm-up and starting play. The evidence supports the physical move and the distance; it does not tell us how pace, staging, or crowding will feel after reopening. Still, the relocation is one of the more measurable design changes in the 2026 work.
Practice Area Benchmarks
The practice green increased from 7,500 square feet to 8,000 square feet, while the chipping and short-game area now accommodates shots up to 75 yards. Those figures matter because practice facilities are often judged by the variety of shots they permit, not only by turf condition. A 75-yard ceiling allows partial wedges and pitch shots that more closely resemble scoring shots seen during play.
For comparison as a design principle, strong architecture often links practice preparation with on-course demands; that same concept appears in broader discussions of golf course architecture. At Mirasol, the documented benchmark is narrower but still meaningful: more putting surface, a relocated practice node, and a short-game area with longer shot capacity.
Finishing-Hole Visibility And Green Flexibility
The 18th hole is the most prominent on-course example in the reported work. Its green complex was moved about 20 yards left of its prior position. The stated reasons were to improve separation from the practice range and improve visibility from the planned multipurpose building. Those are not abstract design goals; they directly affect safety margins, spectator or clubhouse viewing angles, and how the hole presents itself near the finish.
Green Movement At The 18th
Moving a green 20 yards left can change more than the final approach yardage. It can alter preferred angles from the fairway, reshape recovery options around the putting surface, and change how bunkers frame the target. The source material confirms the relocation and its purpose, but it does not provide a revised hole diagram, yardage, or green-contour map. For that reason, any shot-value judgment should remain provisional until the reopened hole can be compared against its former playing corridor.
The documented intent is still useful. Separation from the practice range points to operational design, while visibility from the new building points to venue experience. The Sunset Course improvements therefore connect the final hole to the club’s larger facility plan rather than treating it as an isolated architectural edit.
Pinnable Areas And Strategic Continuity
Greens around the 18th and other finishing holes were enlarged and reshaped to create more pinnable areas while mostly retaining their original strategic contours. That is a cautious form of modernization. Enlarging a green can increase hole-location variety, but retaining strategic contours suggests the design team did not intend to erase the original decision-making structure.
This distinction is important. More pinnable space can help maintenance teams distribute wear, especially in high-traffic areas, and can give golfers more varied approach demands over repeated rounds. The research does not quantify the added square footage on those finishing greens, so the safest benchmark is qualitative: greater hole-location flexibility, with original strategic character reportedly preserved.
Bunkers, Turf, And Irrigation As Performance Measures
Bunkers were rebuilt around 18 and across the course, with some repositioned or removed where needed. The bunker style also shifted from older flat floor and grass-faced designs to a sand-flashed presentation. This is one of the more visible changes in the Sunset Course improvements, but the performance effect depends on placement, depth, sand consistency, and maintenance execution after reopening.
Bunker Presentation And Strategic Readability
Sand-flashed bunker faces tend to read more clearly from distance than low-profile grass faces, but that general design observation should not be overstated without site diagrams. At Mirasol, the supported fact is the style change, plus rebuilding, repositioning, and selective removal. From a benchmarking standpoint, those moves can be assessed later by asking whether bunkers define landing zones more clearly, defend green angles more fairly, and reduce maintenance burden compared with the previous forms.
The key caution is that visual drama and strategic clarity are not the same thing. A bunker can look stronger and still fail to influence play if it sits outside common landing patterns. Conversely, removal can improve strategy if it opens an alternate line or reduces clutter. The available data confirms construction choices, not their measured scoring effect.
Turf And Water-Control Infrastructure
All greens are being re-grassed with TifEagle bermuda, while fairways and other non-green turf are being grassed with Bimini bermuda. A new irrigation system is also being installed across the Sunset Course, designed by Aqua Turf International and implemented through Leibold Irrigation. These are infrastructure benchmarks more than style points.
In warm-season golf design, turf selection and irrigation coverage influence playing firmness, recovery from wear, and day-to-day consistency. The research does not provide agronomic performance targets, so it would be inaccurate to claim a specific speed, firmness, water-saving figure, or maintenance-cost reduction. What can be said is that the turf and irrigation package aligns with the project’s stated emphasis on maintainability.
- Practice function: larger putting green and short-game shots up to 75 yards.
- Finishing-hole design: 18th green moved about 20 yards left for range separation and building visibility.
- Green flexibility: enlarged and reshaped finishing greens with more pinnable areas.
- Hazard presentation: rebuilt bunkers with sand-flashed faces replacing older flat floor and grass-faced forms.
- Infrastructure: TifEagle greens, Bimini non-green turf, and a new irrigation system.
Schedule Context And Master Plan Fit

The renovated holes and practice areas are expected to reopen in November 2026, and additional renovation work is scheduled to resume in March 2027 for remaining holes. That schedule places the September 2026 work in a phased sequence rather than a finished course-wide endpoint.
How The 2026 Work Sets Up Later Phases
The broader club Master Plan, announced in July 2024, set out an $82 million renovation program that includes a full Sunset Course renovation in 2028 led by J. Drew Rogers, the course’s co-original designer, followed by a Sunrise Course renovation in 2029 under Tom Fazio, according to the Mirasol renovation announcement. That longer arc matters because some 2026 work may function as preparation for later course-wide changes.
From a design-review perspective, this means the 2026 Sunset Course improvements should not be judged as the final architectural statement for the course. They are documented upgrades within a larger capital plan. The evidence supports a phased reading: immediate changes to practice access, 18th-hole geometry, bunkers, turf, and irrigation, with broader Sunset work still planned for 2028.
What Remains Unverified
Several useful benchmarks are not available in the cited material. There is no published hole-by-hole yardage comparison, no confirmed change in par, no green-speed target, no water-use projection, and no post-reopening playability data as of October 7, 2026. Those gaps do not weaken the known facts, but they should limit the claims made about outcome.
For readers interested in sports venues beyond golf, a broader look at related sites and team facilities can be explored at dashershockey.com, which is part of the same publishing network, highlighting how infrastructure, like that at Mirasol, is pivotal in shaping player preparation and spectator experiences.
Country Club At Mirasol’s Sunset Course
The supported benchmark is clear: the 2026 work at The Country Club at Mirasol’s Sunset Course combined targeted architectural edits with practice-area and infrastructure upgrades. The most measurable changes are the 35-yard practice-green relocation, expansion from 7,500 to 8,000 square feet, short-game shots up to 75 yards, the 18th green’s 20-yard leftward move, bunker reconstruction, new turf selections, and a new irrigation system.
The more cautious judgment is that these changes appear designed to improve flexibility, visibility, maintainability, and preparation before play. Whether they also change scoring patterns or member preference can only be assessed after the November 2026 reopening and after later phases are completed. For now, the Sunset Course improvements stand as a documented example of how private-club course work can blend architecture, agronomy, and facility planning without relying on unsupported claims about performance.